Delivery · Responsibility guide
China to UAE Kitchen Delivery: Who Is Responsible for What?
The short answer
Production release and export packing are coordinated in China. Importing, local compliance, site receiving and installation belong to the appointed UAE parties unless the written scope says otherwise.

Agree the handoff before production.
A statement such as delivery to the UAE is not enough to define responsibility. The project should identify the importer, Incoterm, receiving address, local handling plan and installation party before release.
| Stage | Primary responsibility | Decision to record |
|---|---|---|
| Production release | Anray Works | Approved drawings and specification |
| Export handoff | Agreed parties | Incoterm and document set |
| Import and customs | Buyer-appointed importer | Entity, duties and compliance |
| Site receiving | Local receiving party | Access, unloading and storage |
| Installation | Qualified local contractor | Site, services and final interfaces |
Production and export in China.
The current project information, inspection points and packing requirements should be closed against the approved record. Shipping documents and packing information should match the agreed commercial handoff.
Import, receiving and installation in the UAE.
The buyer-appointed importer confirms customs, duties and local requirements. Qualified local parties confirm final dimensions, services, compliance, receiving and installation.
A visible responsibility chain protects the handoff without pretending that one party controls every local condition.
Common questions
What clients usually ask.
Does an Incoterm define every project responsibility?
No. It defines a commercial transfer point, but drawings, receiving, compliance and installation still need a responsibility schedule.
Who verifies the final site dimensions?
Qualified local parties verify final dimensions and site conditions unless a different written scope is agreed.
What should be checked at receiving?
Package count, visible condition, unloading method, protected storage and the damage-reporting process should be confirmed.
Have a live project?